Ads

seeks

Seeks

Greek partners/investors to build a photovoltaic park

We are looking to find Greek partners/investors for the construction of a 17 MW solar park located in the area of the town of Sungurlare - providing some of the best conditions for a high-producing photovoltaic park. An extremely efficient, cost-effective and workable project that will stand out in the market. The project has all the necessary documents up to a building permit and the park is ready for construction.

Contacts

Seeks

An American company is looking for a property for production activities

The company is engaged in the processing of paper for recycling. No harmful chemicals are used in the processing. The final product will be shipped to China, so the property needs to have good land connectivity with easy access to the Black or Mediterranean seas. It is also recommended that the property has a hall with dimensions of at least 30 x 40 x 10 m., where the production activity can be carried out and the possibility of storage of at least 1000 sq.m.

Contacts

Seeks

Greek company is looking for investments in photovoltaic projects in Greece.

The Greek company has three photovoltaic projects: Vonitsa (20 MWp), Kozani (18 MWp) and Drama (20 MWp), which are in the same status: Application submitted to determine the conditions for connection to the public electricity grid, this is the last step of his work as a project developer.
The standard waiting time for the granting of this expected connection permit is 12 to 18 months. By applying for storage for these locations, the waiting time for the connection permit to be issued can be reduced to 6 to 12 weeks.
At the same time, there is an application to participate in the tendering process for the purchase of this electricity by the local grid operator. The feed-in tariffs currently on offer range between 5.9- and 6.3-euro cents per kWh. This feed-in tariff, which is guaranteed by the public sector for 20 years, makes the projects "bankable".
The market price for completed projects is around € 200,000/MW. The investor has the opportunity to secure a 25% share in the operation of the parks or in the proceeds from the rights if he enters the market at this time at a price of €10,000/MW. The minimum amount is € 180,000 for the smallest park. A second-ranking land charge in Freiburg, the assignment of rights and an additional assignment of zeolite mining rights in Greece are available as security for the payment.

Contacts

Seeks

Greek companies are interested in purchasing land in Bulgaria

The Greek companies Skytrack and LSO Consulting are interested in purchasing land in Bulgaria, which is interconnected to the photovoltaic grid with power from 10MW to 100MW. Skytrack is a Software as a Service (SaaS) company, with a long experience in desiging software, telemetry and embedded communications and IT systems, alongside databases and their applications. LSO Consulting is a modern and dynamic company activating in the financial sector. It was established with the aim of providing specialized services to businesses and organizations in the private sector.

Contacts